How to Plan a Whole-Home Renovation in Kennesaw

This guide covers how to plan for Georgia homeowners. A whole-home renovation touches nearly every room and system at once. Planning it as one coordinated project, rather than a series of separate jobs, is what keeps it on budget.

Start With How You Want to Live

List what is not working: flow between rooms, storage, light, bedrooms, bathrooms and work space. Those needs, not individual finishes, should shape the plan.

Assess the House Before Designing

In older Kennesaw homes, the condition of the foundation, framing, roof, wiring, plumbing and HVAC can determine what is practical. A thorough assessment prevents designing around problems you have not found yet.

Decide on Phasing

Doing everything at once is usually faster and more efficient, but it often means moving out. Phasing lets you stay home, though it extends the overall timeline and repeats some setup costs.

Sequence Systems Before Finishes

Structural changes, electrical, plumbing, HVAC and insulation come first. Updating them while walls are open is far cheaper than returning later.

Budget by Room and by System

Break the budget into rooms and systems, set a finish level for each and hold a contingency for older-home discoveries.

Keep Design Consistent

Flooring, trim, doors and lighting that carry through the house make a renovated home feel cohesive rather than pieced together.

See whole-home remodeling, the planning guide and our process.

Planning Checklist

Whole-home renovation planning checklist
StepWhy it matters
Assess structure and systemsPrevents designing around problems that have not been found
Set priorities by roomKeeps the budget focused on what matters most
Choose phasingBalances speed against living at home during work
Confirm permit jurisdictionCity of Kennesaw and Cobb County have separate processes
Hold a contingencyOlder homes often hide conditions that must be corrected

National Context

The Harvard Joint Center for Housing Studies projected in April 2026 that U.S. homeowner spending on improvements would reach about $518 billion by the end of 2026. Whole-home projects are among the most complex part of that market, which is why a written scope and a planned schedule are so important.

Frequently Asked Questions

Should we move out during a whole-home renovation?

It depends on the scope. If kitchens, bathrooms and major systems are all affected at once, a short move-out often shortens the overall schedule.

Can a whole-home renovation be phased?

Yes. Phasing lets you stay at home, though it usually extends the total timeline.

Kennesaw by the Numbers

Planning a remodel starts with understanding the local housing market. These figures from the U.S. Census Bureau give useful context for Kennesaw homeowners weighing how much to invest in their homes.

Kennesaw at a glance
MeasureValue
Population (July 1, 2025 estimate)37,970
Median value of owner-occupied homes (2020-2024)$335,400
Owner-occupied housing rate (2020-2024)64.6%
Median household income (2020-2024, 2024 dollars)$83,356
Persons per household (2020-2024)2.52

Source: U.S. Census Bureau QuickFacts, Kennesaw city, Georgia.

With a median owner-occupied home value of $335,400 for 2020-2024, with roughly two-thirds of homes owner-occupied, many Kennesaw homeowners have meaningful equity in their homes, and that shapes how they think about updating rather than moving. Matching the scope of a remodel to the neighborhood, the age of the house and how long you plan to stay is one of the most important early decisions.

Talk Through Your Kennesaw Project

Every Kennesaw home is different, so the most reliable numbers and timelines come from seeing your space. Request an estimate or call (470) 847-9076 to talk with Oak & Mason about your goals.

Define what whole-home means for you

A whole-home renovation can mean a cosmetic refresh of every room, a major update to kitchens, baths and floors or a complete gut that changes layout and systems. Defining the scope early keeps the budget realistic. Walk through the house and list what must change, what you would like to change and what you can live with.

Set the budget and tiers

Published whole-home data lists cosmetic refreshes at about $15 to $60 per square foot, mid-range at $60 to $130, gut renovations at $130 to $200 and high-end projects at $200 or more. Multiplying by your square footage gives a planning range. See our whole-home renovation cost guide and cost per square foot page. Always add a contingency of ten to twenty percent.

Decide whether to move out

Moving out shortens the schedule and reduces cost because crews work freely in every room. Staying home saves temporary housing but adds complexity and sometimes repeat work. Many homeowners choose a hybrid: move out during the heaviest work or phase the project so part of the house remains usable. Consider your family, pets and work from home needs.

Choose how to phase the work

Phasing spreads cost and disruption. A common sequence starts with structure and systems, then kitchens and baths, then flooring and paint, and finally outdoor spaces. Each phase should be scoped and priced separately while following one overall plan. This prevents rework, such as installing flooring before electrical work.

  1. Structure and systems.
  2. Kitchens and bathrooms.
  3. Flooring, trim and paint.
  4. Lighting and finishes.
  5. Exterior and outdoor spaces.

Plan systems before finishes

Electrical, plumbing, HVAC and insulation are the most efficient to upgrade while walls are open. Old panels, ungrounded wiring, galvanized pipes and weak insulation are common in older homes. Plan these upgrades before cabinets and tile are chosen, because they affect layout and cost.

Hire the right team

A whole-home project needs a contractor who can coordinate many trades, manage schedules and communicate clearly. Check license, insurance, references and experience with similar projects. Ask who will be on site daily and how changes are handled. See our guide to choosing a contractor.

Permits, design and engineering

Whole-home projects usually need permits for structural, electrical, plumbing and mechanical work. Drawings and engineering may be required for layout changes. Properties inside Kennesaw city limits are permitted through the City of Kennesaw and unincorporated addresses through Cobb County. See our permits guide.

Selections and lead times

A whole-home project involves many selections: cabinets, flooring, tile, fixtures, lighting, paint and appliances. Make decisions in order, starting with layout, then major items, then finishes. Order long-lead items early. A shared selection list with deadlines helps everyone stay on track.

Next step

If you are planning a whole-home renovation, call (470) 847-9076 for a free consultation. We will walk the house, discuss priorities and give you a written scope and price with no obligation. See our whole-home remodeling page. Oak & Mason is licensed and insured, and our work is backed by a warranty.

Room-by-room planning

A whole-home plan is easier when you break it into rooms. For each room, define the goal, the scope and the priorities, and note how it connects to others.

Energy and comfort upgrades

A whole-home project is the best time to improve energy performance. Add insulation, seal air leaks, upgrade windows and doors where it matters and right-size heating and cooling. Improved comfort and lower bills are lasting benefits, and these upgrades are hard to do later without disruption.

Protecting your home and belongings

Before work begins, plan for storing furniture, protecting floors and sealing rooms from dust. Pack or move valuables. Decide what stays and what moves out. Ask the contractor how dust will be controlled, how pets and children are kept safe and how the site is secured at night.

Managing communication and decisions

Large projects require many decisions. Choose one decision maker or a clear process for couples and families. Use a shared selection list, keep photographs and measurements together and respond to questions promptly. Weekly meetings with your contractor keep the project on track and prevent surprises.

Contingency and hidden conditions

Older homes hide surprises, and a whole-home project opens many walls and floors. Plan a contingency of ten to twenty percent, and ask how hidden conditions are documented and approved. Photographs and written change orders keep everyone informed and costs under control.

Common mistakes to avoid

A sample whole-home sequence

Here is how a typical whole-home renovation might unfold. Real schedules vary by size and scope.

  1. Months 1 to 2: consultation, design, scope and budget.
  2. Months 2 to 3: selections, permits and ordering.
  3. Months 3 to 4: demolition, framing and structural work.
  4. Months 4 to 5: plumbing, electrical and HVAC rough-in; inspections.
  5. Months 5 to 6: insulation, drywall and priming.
  6. Months 6 to 8: cabinets, counters, tile, flooring and trim.
  7. Month 8 and after: paint, fixtures, final inspections and walkthrough.

Living arrangements

Decide early where you will live. Options include moving out for the whole project, moving out during the heaviest phases or living in the house and relocating within it as work progresses. Consider the cost of temporary housing, storage and meals. We help you compare the trade-offs in time and money.

After the renovation

When construction ends, you will receive warranty information, care instructions and copies of permits and inspections. Walk the house with your contractor and complete a punch list. Keep records for resale and insurance. A whole-home renovation is a major change, and it is worth taking the time to enjoy and care for the result.

What to ask before you start

Before you decide

Whatever you decide about how to plan, confirm your contractor’s license first. Georgia licenses residential and general contractors through the Georgia Secretary of State, so ask any builder for their license details up front. Oak & Mason is licensed and insured, and we are glad to talk through how to plan for your home. A written scope, schedule and payment plan keep decisions about how to plan from becoming surprises later. If you are weighing how to plan, a free consultation is the easiest way to see what fits your house. Taking how to plan one decision at a time keeps the budget and the schedule predictable. Call (470) 847-9076 and we will help you think through how to plan for your project.